
The Story
Product has Lead Time of 3-4 Weeks.
This is the Mopar upgrade, with a 6 bolt top cover. It is not a direct swap with the 2879. The only difference is the sector shaft, so you have to change your pitman arm. This price includes a new stock pitman arm and tie rod end.

Details & Craftsmanship
Every detail has been carefully considered to bring you the perfect product.
Description
Product has Lead Time of 3-4 Weeks.
This is the Mopar upgrade, with a 6 bolt top cover. It is not a direct swap with the 2879. The only difference is the sector shaft, so you have to change your pitman arm. This price includes a new stock pitman arm and tie rod end.


